Australian Reservoir Services

Stanley Road Tank Roof Replacement

Australian Reservoir Services successfully completed the upgrade of Stanley Road Tank for Westernport Water consisting of removal and replacement of the roof structure and sheeting, as well as the access ladder system to be upgraded to comply with AS 1657, with the addition of electrical works and new fencing enclosures. The reservoir is a reinforced concrete tank with a nominated capacity of 1.5ML, a diameter of 24m, and 4.6m high. The Stanley Road Storage Tank (Tank) in Grantville is located approximately 1.5km from the intersection of Bass Highway and Stanley Road.

Australian Reservoir Services has completed several roof replacements on water reservoirs, including the Flying Fish Point Reservoir Upgrade.

ProjectStanley Road Tank Roof Replacement
ClientWesternport Water – VIC
ScopeStructural roof and sheetings replacement, external access system redesign and upgrade, new roof fall arrest system, new ventilation system, internal access ladder, and enclosure fencing.
Timeframe16 Weeks. Completed by August 2023
Australian Reservoir Services

Flying Fish Point Reservoir Roof Replacement

Australian Reservoir Services successfully completed the upgrade of Flying Fish Point Reservoir for Cassowary Coast Regional Council consisting of removal and replacement of the roof structure and sheeting, as well as the access ladder system to be upgraded to comply with AS 1657. The reservoir is a reinforced concrete tank with a nominated capacity of 3.2ML, a diameter of 20m, and 11m high. Flying Fish Point Reservoir is located in a cyclones prone area, therefore, a new pre-cambered structural aluminium and aluminium sheeting design replaced the existing arrangement to ensure the quality of the water in the reservoir is not compromised.

Australian Reservoir Services has completed several roof replacement on water reservoirs, including the Muswellbrook Reservoir No.5 Reservoirs Upgrade.

Project Flying Fish Point Reservoir Roof Replacement and External/Internal Access Upgrade
Client Cassowary Coast Regional Council – QLD
ScopeStructural aluminum roof and sheetings replacement, external access system redesign and upgrade, new roof fall arrest system, new ventilation system and internal access ladder.
Timeframe20 Weeks. Completed by June 2023
Reservoir Safety Upgrades

Fisherman’s Paradise Reservoir Safety Upgrades

Australian Reservoir Services successfully completed the upgrade of Fisherman’s Paradise Reservoir for Shoalhaven City Council consisting of recoating the internal and external surfaces, as well as providing new internal access in compliance with AS1657. The reservoir is a mild steel tank with a nominated capacity of 4ML, a diameter of 27m and 7m high. This project allowed Australian Reservoir Services to implement mobile scaffolding equipment for external coatings in order to provide a cost-effective solution to Shoalhaven City Council with no impact on the environment and surroundings.

ProjectFisherman’s Paradise Reservoir Upgrades
ClientShoalhaven City Council – NSW
ScopeExternal and internal coatings, internal access ladder design and installation, roof upgrades and repairs, including new roof ventilators, new inlet and outlet nozzles and new overflow pipe.
Timeframe20 Weeks. Completed by December 2020
Reservoir staircase replacement

Green Point Reservoir Staircase Replacement and External Coatings

Australian Reservoir Services successfully completed the upgrade of Green Point Reservoir for Central Coast City Council consisting of removal and replacement of the access staircase in compliance with AS 1657 and external coatings. The reservoir is a mild steel tank with a nominated capacity of 9.1ML, a diameter of 27.43m and 15m high. This project allowed Australian Reservoir Services to implement mobile scaffolding equipment for external coatings in order to provide a cost-effective solution to Central Coast Council.

Australian Reservoir Services has completed several jobs for the Central Coast Council, including the East Gosford and Avoca Beach Reservoirs Upgrade.

ProjectGreen Point Reservoir Staircase Replacement and External Coatings
ClientCentral Coast Council – NSW
ScopeExternal coatings, external access staircase design and installation, electrical upgrades.
Timeframe20 Weeks. Completed by May 2020